Free tool · no sign-upConstruction quantities
Concrete Volume and Cost Calculator
Convert structural dimensions into net and ordered volume, then compare ready-mix with site mixing and optionally add a steel budget range.
Assumptions reviewed:
Advanced options
Result
- Cement (50 kg)
- 133 bags
- Sand
- 7.56 m³
- Gravel
- 15.12 m³
- Pumped ready-mix
- EGP 45,360 – EGP 56,700
- Formwork, reinforcement and pouring labour
- EGP 16,200 – EGP 19,800
- Estimated total
- EGP 61,560 – EGP 76,500
- Materials 74%
- Labour 26%
Midpoint allocation by cost item.
Published dated price ranges; steel and cement can change weekly. Steel quantity is for budgeting only and must be designed by the structural engineer.
We do not save your inputs. The result stays in the link and on your device.
How it works and assumptions
- Net volume comes from area and thickness, repeated dimensions, or a directly entered volume.
- Ordered volume adds 5% for ready-mix or 10% for site mixing.
- Reinforced concrete uses 350 kg cement, 0.4 m³ sand and 0.8 m³ gravel per m³.
- Optional steel applies the element's kg/m³ range plus 4% cutting waste; it is a budget allowance, not a design.
- Reinforced / plain cement
- 350 / 250 kg/m³
- Ready-mix / site / steel waste
- 5% / 10% / 4%
- Ready-mix reinforced / plain
- EGP 2,400–3,000 / 1,400–1,700 per m³
- Steel / cement tonne
- EGP 37,000–40,000 / 3,350–4,100
Frequently asked questions
How many cement bags are in one cubic metre of concrete?
Reinforced concrete uses 7 bags of 50 kg per m³; plain concrete uses 5. The tool applies this after waste and rounds up.
How much concrete does a 120 m² slab need?
At 15 cm, net volume is 18 m³. It becomes 18.9 m³ with 5% ready-mix waste or 19.8 m³ with 10% site-mix waste.
Ready-mix or site-mixed concrete?
Ready-mix normally gives faster placement, more consistent batching and lower waste, but costs more in material. It is generally preferable for structural slabs and columns; small blinding quantities may be mixed on site.
How much steel is used per cubic metre?
It varies by element: solid slabs 80–120, flat slabs 140–160, columns 150–250 and footings 50–80 kg/m³. The structural engineer's drawings control.
What are today's steel and cement prices?
The dated model uses EGP 37,000–40,000 per tonne for major-mill steel and EGP 3,350–4,100 for cement. Both can move weekly; enter your quotation.
What labour is included?
Reinforced work allows EGP 900–1,100/m³ for formwork, steel fixing and pouring; plain concrete allows EGP 150–300/m³ for pouring only.