Free tool · no sign-upConstruction quantities

Plaster and Brick Quantity Calculator

Estimate plaster and masonry separately or together, with purchase-unit rounding and the wall thickness appropriate to red brick or AAC.

Assumptions reviewed:

Calculate
Net plaster area (m²)

Wall and ceiling surface after openings; whole-apartment walls are roughly 2.5 times floor area, plus ceilings.

Cement splash coat
Advanced options
Plaster thickness (cm)

Result

Plaster cement
19 bags
Plaster cement (950 kg)
19 × 50 kg bags
Sand (2.8 m³, rounded to 0.5 m³)
3 m³
Cement and sand
EGP 4,540 – EGP 5,520
Plaster labour (30–50 EGP/m²)
EGP 3,000 – EGP 5,000
Plaster total
EGP 7,540 – EGP 10,520

Planning estimate using a 1:4 mix and trade quantities including waste. Dated market ranges exclude delivery and on-site storage.

We do not save your inputs. The result stays in the link and on your device.

How it works and assumptions

  1. At 2 cm, plaster uses 7 kg cement and 0.023 m³ sand per m²; a splash coat adds its own material.
  2. Red-brick count uses the selected brick and wall thickness, adds 6% waste and rounds to 50; mortar is calculated per thousand bricks.
  3. AAC volume follows 10 or 20 cm thickness, adds waste and uses 22 kg adhesive per m³.
  4. Cost combines masonry, mortar or adhesive and the relevant labour range.
Dated inputs used by this calculator
Plaster at 2 cm
7 kg cement + 0.023 m³ sand/m²
1:4 mix including waste; site-engineer references, 2026. Reviewed 2026-09-25.
Red-brick waste
6%
Egyptian trade practice. Reviewed 2026-09-25.
Mortar per 1,000 bricks
3.25 cement bags + 0.42 m³ sand
Al-Emar Misr, 2026. Reviewed 2026-09-25.
Red brick / AAC
EGP 2,200–3,200 per 1,000 / 2,800–3,500 per m³
Akhbar Al-Youm, 25 May 2026; Masr24. Reviewed 2026-09-25.

Frequently asked questions

How much cement does 100 m² of plaster need?

At 2 cm with a splash coat, about 950 kg or 19 fifty-kilogram bags, plus roughly 3 m³ of sand. Thicker or uneven walls increase both amounts proportionally.

What is the correct plaster mix and splash coat?

A common mix is one part cement to four parts sand, applied as base and finish coats. The rough splash coat is thrown onto brick or concrete first to improve bond and reduce cracking.

How many bricks are in one square metre of wall?

A 12 cm wall using 25×12×6 cm red brick uses about 55 bricks/m² before 6% waste; a 25 cm wall uses 110.

Red brick or AAC block?

Red clay brick is cheaper, heavier and uses cement mortar. AAC is lighter, faster and better insulated, but costs more per cubic metre and needs specialised fixings for heavy loads.

Should new plaster be water-cured?

Yes. Wet it two or three times daily for at least three days, longer in summer.

Cement gains strength through hydration; painting should wait until the plaster is fully dry, commonly around three weeks.

Continue your research

Share this page

The link opens this same page, with its dated prices.

All sections

Browse

Prices

Calculate

Learn

Ask on WhatsApp