Free tool · no sign-upFinishing and renovation
Egypt Apartment Finishing Cost
Convert contract gross area to internal net area, apply a dated finishing range and add commonly excluded kitchen and sanitary-fixture costs.
Assumptions reviewed:
Advanced options
EGP 30,000–EGP 50,000 fixtures per bathroom
Result
- Calculated net area
- 90.0 m²
- Rate per net m² (Lux)
- EGP 3,500–EGP 5,000
- Base materials and labour
- EGP 315,000–EGP 450,000
- Contingency (12%)
- EGP 37,800–EGP 54,000
- Materials (65%)
- EGP 229,320–EGP 327,600
- Expected duration
- 12.0–18.0 weeks
- electrical 15%
- plumbing 14%
- plaster 5%
- floors 21%
- paint 10%
- gypsum 8%
- aluminum 13%
- doors 10%
- misc 5%
Illustrative dated market ranges on net area. A contractor's site-specific quotation controls; appliances, furniture and air conditioning are excluded.
We do not save your inputs. The result stays in the link and on your device.
How it works and assumptions
- Gross contract area is converted to net internal area unless net area is entered directly.
- The selected standard's material-and-labour range per net square metre creates the base range.
- Contingency and optional kitchen and bathroom fixtures are added; duration is reported with a delay allowance.
total range = net area × finishing rate + contingency + selected exclusions
- Net from gross
- 75%
- Contingency
- 12%
- Materials share
- 65%
- Cost review date
- 2026-09-25
Frequently asked questions
What is the 2026 finishing cost per square metre?
The dated ranges run from EGP 3,000–3,500 for economy finishing to EGP 8,000–10,000 for ultra-lux, on net area including materials and labour.
Why use net rather than advertised area?
A contractor finishes the interior inside the walls, while contract area includes a share of common spaces. The tool estimates net area at 75% of gross unless you enter net area directly.
What is commonly excluded from a per-metre quote?
Kitchen cabinets, sanitary fixtures, appliances, air conditioning and furniture are commonly outside the headline rate. The tool can add kitchen and bathroom-fixture ranges.
How long does finishing take?
For a medium net-area unit, the published schedule is 12–18 weeks for mid-level finishing and 18–24 weeks for higher specifications, before a 15–30% delay allowance.
How can I control overruns?
Keep a 12% contingency, obtain a bill of quantities rather than only a per-metre rate, secure volatile materials early and tie contractor payments to completed stages.