Free tool · no sign-upFinishing and renovation

Egypt Apartment Finishing Cost

Convert contract gross area to internal net area, apply a dated finishing range and add commonly excluded kitchen and sanitary-fixture costs.

Assumptions reviewed:

Unit area (m²)
Area basis
Finishing standard
Kitchen
Advanced options
Contingency (%)
Bathrooms
2

EGP 30,000–EGP 50,000 fixtures per bathroom

Bathroom fixtures

Result

Estimated midpoint
EGP 428,400
range EGP 352,800–EGP 504,000
Calculated net area
90.0 m²
Rate per net m² (Lux)
EGP 3,500–EGP 5,000
Base materials and labour
EGP 315,000–EGP 450,000
Contingency (12%)
EGP 37,800–EGP 54,000
Materials (65%)
EGP 229,320–EGP 327,600
Expected duration
12.0–18.0 weeks
  • electrical 15%
  • plumbing 14%
  • plaster 5%
  • floors 21%
  • paint 10%
  • gypsum 8%
  • aluminum 13%
  • doors 10%
  • misc 5%

Illustrative dated market ranges on net area. A contractor's site-specific quotation controls; appliances, furniture and air conditioning are excluded.

We do not save your inputs. The result stays in the link and on your device.

How it works and assumptions

  1. Gross contract area is converted to net internal area unless net area is entered directly.
  2. The selected standard's material-and-labour range per net square metre creates the base range.
  3. Contingency and optional kitchen and bathroom fixtures are added; duration is reported with a delay allowance.

total range = net area × finishing rate + contingency + selected exclusions

Dated inputs used by this calculator
Net from gross
75%
Egyptian contract-area convention. Reviewed 2026-09-25.
Contingency
12%
Finishing-market practice. Reviewed 2026-09-25.
Materials share
65%
Dated contractor breakdowns. Reviewed 2026-09-25.
Cost review date
2026-09-25
Smart For Decor, Royal Home and HomeRun requests in 2026. Reviewed 2026-09-25.

Frequently asked questions

What is the 2026 finishing cost per square metre?

The dated ranges run from EGP 3,000–3,500 for economy finishing to EGP 8,000–10,000 for ultra-lux, on net area including materials and labour.

Why use net rather than advertised area?

A contractor finishes the interior inside the walls, while contract area includes a share of common spaces. The tool estimates net area at 75% of gross unless you enter net area directly.

What is commonly excluded from a per-metre quote?

Kitchen cabinets, sanitary fixtures, appliances, air conditioning and furniture are commonly outside the headline rate. The tool can add kitchen and bathroom-fixture ranges.

How long does finishing take?

For a medium net-area unit, the published schedule is 12–18 weeks for mid-level finishing and 18–24 weeks for higher specifications, before a 15–30% delay allowance.

How can I control overruns?

Keep a 12% contingency, obtain a bill of quantities rather than only a per-metre rate, secure volatile materials early and tie contractor payments to completed stages.