Plumbing Points and Pipe Calculator
Count supply and drainage points by room, add appliances and heaters, and round every pipe size to four-metre lengths.
Assumptions reviewed:
9 supply and 5 drainage points per full bathroom.
4 supply and 2 drainage points per kitchen.
Advanced options
Result
- Hot and cold supply points
- 23 points
- Drainage points
- 13 points
- PPR 20 mm branch, 4 m lengths
- 18 lengths · 69 m
- PPR 25 mm main, 4 m lengths
- 7 lengths · 27 m
- PPR 32 mm riser, 4 m lengths
- 2 lengths · 5 m
- 110 mm drain, 4 m lengths
- 2 lengths · 8 m
- 50 mm drain, 4 m lengths
- 5 lengths · 20 m
- Pipe materials
- EGP 4,360 – EGP 6,940
- Rough-in labour
- EGP 9,000 – EGP 12,600
- Bathroom labour market reference
- EGP 7,500 – EGP 9,000
- Sanitary fixtures (Mid-range)
- EGP 66,000 – EGP 112,000
- Fixture installation
- EGP 5,000 – EGP 7,000
- Estimated total
- EGP 84,360 – EGP 138,540
Planning estimate using standard bathroom and kitchen points and average pipe runs. PPR price inputs are lower-confidence 2024–2025 observations.
We do not save your inputs. The result stays in the link and on your device.
How it works and assumptions
- Bathrooms and kitchens add standard hot/cold supply and drainage points; appliances add one of each.
- Pipe routes are grouped into PPR and drainage diameters and round up to 4 m lengths.
- Pipe materials, rough-in labour, fixtures and fixture installation are priced separately.
- A per-bathroom market labour reference is shown beside the point-based estimate.
- Bathroom supply / drainage
- 9 / 5 points
- Kitchen supply / drainage
- 4 / 2 points
- Pipe purchase length
- 4 m
- Rough-in labour
- EGP 250–350/point
Frequently asked questions
How many plumbing points are in a full bathroom?
A full bathroom has about 9 supply and 5 drainage points. A kitchen has 4 supply and 2; each washer adds one supply and one drain.
How is PPR different from older pipes?
Heat-welded PPR is now standard for hot and cold supply: it resists corrosion and avoids threaded joints. Ordinary PVC is for drainage, not pressurised hot-water supply.
Why pressure-test before tiling?
A hidden leak after tiling means demolition. Cap the network, pressurise it—commonly around 6–8 bar—and hold for 24 hours before closing chases; record the gauge and routes.
One heater per bathroom or central?
One per bathroom gives faster hot water and simpler local maintenance but adds equipment and points. A central heater saves devices where bathrooms are close, but distant outlets waste water while waiting.
What drain slope is correct?
Horizontal drainage generally needs about 1–2%, or 1–2 cm per metre. Use 110 mm for the WC branch and about 50 mm for basins, floor drains and washers, with adequate venting.