Free tool · no sign-upMarket and comparison
Egypt Property Price Check
Put a developer or resale quote in context without pretending it is a valuation: compare only with recorded starting prices in the same channel.
Assumptions reviewed:
Catalog prices through
This compares recorded project starting prices; it is not a valuation. Unit area, type, floor, view and finish are unavailable.
Result
- Selected-project starting price
- No project selected
- Median developer starting price in New Cairo
- EGP 9,910,000
- Midrank among 199 projects/phases
- 40.7%
A starting price normally belongs to the smallest or least-premium unit offered on the observation date. A higher quote can be normal for a larger unit or better floor.
We do not save your inputs. The result stays in the link and on your device.
Quote within area starting prices
Above 81 of 199; equal to 0. First quartile EGP 5,846,000, third quartile EGP 15,593,030.
Projects with nearby starting prices
| Project | Starts from | Difference |
|---|---|---|
| Lakeside BloomfieldsMostakbal City | EGP 7,987,000 | +0.2% |
| Acasa Mia | EGP 8,054,417 | −0.7% |
| Beta GreensMostakbal City | EGP 7,850,000 | +1.9% |
| Park CentralMostakbal City | EGP 7,800,000 | +2.6% |
| The Great Lawn Park CentralMostakbal City | EGP 7,800,000 | +2.6% |
How it works and assumptions
- The selected compound's recorded starting price is taken from the same channel as the quote; missing channel prices remain unfilled.
- Difference is quote less starting price as a percentage. Within ±5% is described as numerically close, not fair value.
- Area samples under five are examples only; 5–19 show minimum, median and maximum; 20 or more show quartiles and a ruler.
- Midrank counts lower prices plus half of equal prices and always reports the underlying project count.
- Up to five nearby projects are selected by absolute price difference within the same area and channel.
difference % = (quote − recorded starting price) ÷ starting price × 100
- Price observation
- Each price carries its own date
- Numerically close band
- ±5%
- Minimum sample for median / quartiles
- 5 / 20
Frequently asked questions
How can I tell whether a quoted price is suitable?
Price alone cannot decide because area, floor, finish, view and delivery date matter. The tool provides context: difference from the same compound's recorded start and position among same-channel area starts.
Ask for net area and specifications before judging.
Does a 'starting from' price apply to every unit?
No. It normally describes the cheapest unit or phase available on the observation date, often the smallest or least-premium unit.
Larger and better-positioned units can cost far more.
Why is my quote above the same compound's starting price?
Common reasons are a larger area, higher floor, better view, newer phase or a later date after a price increase. In resale, an owner may also price paid installments plus a premium.
Why not compare developer and resale prices together?
They are different markets. Developer units often carry long plans and construction wait; resale can be cash or an assignment of remaining installments.
Mixing them would produce a benchmark that fits neither quote.
What if the compound is not listed?
Leave the project unselected. The tool will still position the quote among same-channel area starts and show nearby projects, but it cannot calculate a same-compound difference.
Does the tool compare price per square metre?
No. The catalog has project starting prices but not the area of the specific starting unit.
Use the net-area or compare-units tool when you have unit area and loading factor.